OGDCL成功测试了Dars West-3的天然气凝析油井。

来源:www.gulfoilandgas.com,2026年2月19日,地点:亚洲

我们很高兴地宣布,石油天然气开发有限公司(OGDCL)已成功测试了位于信德省坦多阿拉亚尔县达尔斯西-3区块下戈鲁组C砂层的新开发井。该井钻探至2100米总深度,并利用OGDCL的内部专业技术进行了测试。

测试期间,该井在36/64英寸节流阀下,从下戈鲁C砂层储层产出970万标准立方英尺/天的天然气和580桶/天的凝析油,井口流动压力为1725磅/平方英寸。

测试结果进一步证实了达尔斯西地区下戈鲁C砂层储层的油气潜力。管道铺设工作正在进行中,完工后,该井产出的天然气将在KPD-TAY工厂进行处理,然后注入SSGCL管网。

Dars West D&PL合资公司由OGDCL(持股77.5%)和GHPL(持股22.5%)组成。业绩反映了在油藏评价、测试和油田开发方面持续开展的工作。

以上信息根据《2015年证券法》第96条和巴基斯坦证券交易所(PSX)规章第5.6.1(a)条的规定提交,供贵公司会员查阅。

测井、射孔、测试 >>

巴基斯坦测井、射孔、测试新闻 >>


了解更多
电池
车辆
车辆



原文链接/GulfOilandGas

OGDCL successfully tests gas condensate well at Dars West-3

Source: www.gulfoilandgas.com 2/19/2026, Location: Asia

We are pleased to inform that Oil and Gas Development Company Limited (OGDCL) has successfully tested a new development well in C-Sands of Lower Goru Formation at Dars West-3, located in District Tando Allah Yar, Sindh Province. The well was drilled up to a total depth of 2,100 meters, and tested utilizing OGDC's in-house expertise.

During testing, the well produced at a rate of 9.70 MMSCFD of gas along with 580 BPD of condensate at a choke size of 36/64 inches, with a Wellhead Flowing Pressure of 1,725 Psi from the Lower Goru C-Sand reservoir.

The test results reinforce the hydrocarbon potential of the Lower Goru C-Sand reservoirs in Dars West area. Laying of pipeline is in progress, and upon completion, gas from the well will be processed at KPD-TAY plant for onward injection into the SSGCL network.

Dars West D&PL Joint Venture comprises OGDCL as the operator with a 77.5% working interest along with GHPL having working interest of 22.5%. The results reflect the ongoing efforts in reservoir evaluation, testing, and field development.

The above information is submitted in compliance with Section 96 of the Securities Act, 2015, and Clause 5.6.1(a) of PSX Regulations, for dissemination among your members.

Logging, Perforating, Testing >>

Logging, Perforating, Testing News in Pakistan >>


Discover more
battery
vehicle
vehicles