Zephyr Energy 将钻机合同授予 Helmerich & Payne

来源:www.gulfoilandgas.com 2024 年 3 月 15 日,地点:北美

Zephyr Energy plc(AIM:ZPHR)(OTCQB:ZPHRF)是一家落基山石油和天然气公司,专注于通过碳中和运营进行负责任的资源开发,该公司很高兴地宣布,经过详细的选择过程,Zephyr 已与Helmerich & Payne (“H&P”) 为其 257 号钻机提供服务,该钻机将用于重新钻探美国犹他州 Paradox 盆地项目中的 State 36-2 井(“State 36-2R 井”)。 257 号钻机是

一个Flex 3 1,500HP 钻机完全有能力钻计划的井并管理预计会遇到的高油藏压力。该钻机正在结束附近 Uinta 盆地持续且成功的钻探活动,并将在短期内调动至 State 36-2R 井场,预计于 4 月中旬开钻。与此同时,该公司计划调动一台钻机到现场,以便在更大规模的钻井作业之前设置导管。

Zephyr 首席执行官科林·哈灵顿 (Colin Harrington) 表示:
“我们对 Zephyr 运营团队在最近获得最终许可后与 H&P 签订钻机合同方面取得的迅速进展感到高兴,并相信 Rig 257 特别适合 State 36- 2R 钻探。现在的重点是安全高效地钻探该井,预计全面钻井作业将于 4 月中旬开始。”

“随着井场作业的发展,我们期待让投资者充分了解情况。”

钻机、取芯和勘探 >>

美国的钻机、取芯和勘探新闻 >>





原文链接/gulfoilandgas

Zephyr Energy Awards Rig Contract to Helmerich & Payne

Source: www.gulfoilandgas.com 3/15/2024, Location: North America

Zephyr Energy plc (AIM: ZPHR) (OTCQB: ZPHRF), the Rocky Mountain oil and gas company focused on responsible resource development from carbon-neutral operations, is pleased to announce that following a detailed selection process, Zephyr has signed a rig contract with Helmerich & Payne ("H&P") for its Rig 257 which will be used to redrill the State 36-2 well (the "State 36-2R well") on the Company's project in the Paradox Basin, Utah, U.S.

Rig 257 is a Flex 3 1,500HP drilling rig fully capable of drilling the planned well and managing the high reservoir pressures expected to be encountered. The rig is wrapping up a sustained and successful drilling campaign in the nearby Uinta Basin and will mobilise to the State 36-2R well site in the near-term, with an expected spud in mid-April. In the meantime, the Company plans to mobilise a spudder rig to site in order to set the conductor casing ahead of the larger drilling operation.

Colin Harrington, Zephyr's Chief Executive, said:
"We are pleased with the swift progress made by Zephyr's operational team in securing the rig contract with H&P following the recent final permit award, and believe that Rig 257 is particularly well suited for the State 36-2R drill. The focus is now on drilling the well safely and efficiently, with full drilling operations expected to start in mid-April."

"We look forward to keeping our investors well-informed as operations develop at the well site."

Rigs, Coring & Exploration >>

Rigs, Coring & Exploration News in United States >>