智能井口系统在德克萨斯州开设新运营基地

作者:
, 《油田技术》副主编


智能井口系统公司 (IWS) 宣布在德克萨斯州米德兰开设新的运营基地。

自动化技术和数字完井解决方案的快速采用推动了对本地客户支持、物流和全方位服务运营基地的需求,以支持二叠纪盆地。

快速周转设施

IWS 首席运营官 Steve Sinclair-Smith 表示:“在我们评估该地区的客户活动后,我们发现,在二叠纪盆地中心维持一个快速周转设施是必要的。” 现在可以检查,服务和服装我们的设备舰队,并提供对我们的设备的升级。其次是能够将其直接送回现场使用。这个位置使我们的现场团队能够在需要临时通知支持时快速前往井场。结果,我们帮助客户运营前进,从而导致更多的正常运行时间,同时提高WellSite的质量和效率。”

可视化钻机可以更好地了解井场并提高性能

该设施作为 IWS 区域培训中心,配备了全面的井场模拟系统,当地 IWS 团队在此接受培训,客户能够学习如何在受控环境中操作 inVision™ 技术平台。由于每个部署都基于客户的独特标准操作程序,因此现场人员现在可以在索具在现场之前安装和操作其操作的数字双胞胎。

扩大团队以支持客户

IWS 正在代表整个二叠纪盆地的主要运营商开展工作,新基地还将提供进一步增长的机会。中部地区的另一个目标是进一步支持行业的增长和当地经济。为了实现这一目标,IWS 将积极从大米德兰地区招募更多当地员工。

在线阅读文章:https://www.oilfieldtechnology.com/drilling-and-product/06042023/intelligent-wellhead-systems-opens-new-base-of-operations-in-texas/

 

本文已被标记为以下内容:

石油和天然气新闻


原文链接/oilfieldtechnology

Intelligent Wellhead Systems opens new base of operations in Texas

Published by , Deputy Editor
Oilfield Technology,


Intelligent Wellhead Systems, Inc. (IWS) has announced that it has opened a new base of operations in Midland, Texas.

Rapid adoption of automation technology and digital solutions for completions drove the need for local customer support, logistics and a full-service operations base to support the Permian Basin.

Quick turnaround facility

“As we assessed customer activity in the region, it became clear that maintaining a quick turnaround facility in the center of the Permian was necessary,” said Steve Sinclair-Smith, COO for IWS. “We can now inspect, service, and outfit our equipment fleet, along with providing upgrades to our equipment. Followed by the ability to then send it directly back into the field for use. This location makes it possible for our field teams to quickly travel to the wellsite when short-notice support is required. As a result, we help keep customer operations moving forward, leading to more uptime while increasing quality and efficiency on the wellsite,” he added.

Visualising rig-up provides better understanding & performance at wellsite

The facility serves as the IWS regional training centre, outfitted with a comprehensive wellsite simulation system where the local IWS team is trained and customers have the ability to learn how to operate the inVision™ Technology Platform in a controlled environment. As each deployment is based on the customer’s unique standard operating procedures, field personnel can now install and operate the digital twin of their operation before rigging up on location.

Expanding the team to support customers

IWS is working on behalf of major operators throughout the Permian Basin and the new base will also provide opportunities for additional growth. Another objective of the Midland location is to further support industry growth and the local economy. To achieve this, IWS will actively recruit additional local staff from the greater Midland area.

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/06042023/intelligent-wellhead-systems-opens-new-base-of-operations-in-texas/

 

This article has been tagged under the following:

Oil & gas news