Sintana Energy 提供纳米比亚橙色盆地运营的最新情况

作者:
, 《油田技术》编辑助理


Sintana Energy Inc. 提供了有关位于纳米比亚橙色盆地中心的 2813A 和 2814B 区块第二次开采活动的最新消息。

Sintana Energy 提供纳米比亚橙色盆地运营的最新情况

这些区块受石油勘探许可证 83 (PEL 83) 管辖,该许可证由葡萄牙 Galp Energia 的子公司运营。Sintana 间接持有 Custos Energy (Pty) Ltd. 的 49% 权益,而 Custos Energy (Pty) Ltd. 拥有 PEL 83 的 10% 工作权益。纳米比亚国家石油公司 NAMCOR 也拥有 10% 的工作权益。

Mopane-2A 在两个储层中成功发现了碳氢化合物 - AVO-3 中的气凝析油柱,储层最佳位置的净产层较薄,AVO-4 中较小的储层中也发现了轻质油柱。这两个储层都显示出优质的砂岩,具有良好的孔隙度和渗透率、高压和低流体粘度特性,CO 2浓度最低,不含 H 2 S。此外,与之前的所有 Mopane 井一样,没有发现水接触。

Galp 及其合作伙伴将继续分析和整合所有新获得的数据,以便更好地了解莫帕尼综合体,这将支持对这些发现的商业性的持续评估。

Sintana 首席执行官 Robert Bose 表示:“Mopane 的持续成功是该综合体世界级规模和质量的象征。我们期待未来几个月内开展进一步的勘探和评估活动,以进一步揭示我们在纳米比亚橙色盆地中心位置的无与伦比的品质。”

在线阅读文章:https://www.oilfieldtechnology.com/drilling-and-production/06012025/sintana-energy-provides-update-on-operations-in-namibia-orange-basin/

原文链接/OilFieldTechnology

Sintana Energy provides update on operations in Namibia Orange Basin

Published by , Editorial Assistant
Oilfield Technology,


Sintana Energy Inc. has provided the following update regarding the second campaign on blocks 2813A and 2814B located in the heart of Namibia’s Orange Basin.

Sintana Energy provides update on operations in Namibia Orange Basin

The blocks are governed by Petroleum Exploration License 83 (PEL 83) which is operated by a subsidiary of Galp Energia of Portugal. Sintana maintains an indirect 49% interest in Custos Energy (Pty) Ltd., which owns a 10% working interest in PEL 83. NAMCOR, the National Petroleum Company of Namibia, also maintains a 10% working interest.

Mopane-2A successfully encountered hydrocarbons in two reservoirs – a column of gas-condensate in AVO-3 with a thin net pay in the reservoir sweet spot, and also a column of light oil in a smaller reservoir at AVO-4. Both reservoirs showed good quality sands, with good porosities and permeabilities, high pressures and low fluid viscosity characteristics, with minimum CO2 and no H2S concentrations. Also, in line with all previous Mopane wells, no water contacts were found.

Galp and its partners will continue to analyse and integrate all of the newly acquired data to allow a better understanding of the Mopane complex, which will support the continuing assessment of the commerciality of the discoveries.

“The ongoing success at Mopane is emblematic of the world class scale and quality of the complex. We look forward to further exploration and appraisal activities anticipated over coming months to further unveil the unmatched quality of our position at the heart of Namibia’s Orange Basin.” said Robert Bose, Chief Executive Officer of Sintana.

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/06012025/sintana-energy-provides-update-on-operations-in-namibia-orange-basin/

 

This article has been tagged under the following:

Upstream news Upstream drilling news Oil & gas news