bpTT宣布特立尼达和多巴哥近海Mento开发项目产出首批天然气


由《油田技术》编辑助理出版


bp 特立尼达和多巴哥公司 (bpTT) 宣布,Mento 开发项目已通过连接初始发现井安全输送第一批天然气,平台上其余七个总井的钻探活动即将开始。

bpTT宣布特立尼达和多巴哥近海Mento开发项目产出首批天然气

Mento 是 EOG Resources Trinidad Ltd (EOG) 和 bpTT 各占 50% 股份的合资公司,EOG 担任其运营商。该项目包含一座 12 槽、有人值守的设施,位于 bpTT 和 EOG 共同授权的特立尼达东南海岸附近。

BP今年早些时候宣布,作为其上游业务增长战略的一部分,预计将于2025年至2027年期间在全球启动十大重大项目,Mento是其中之一。Mento的产量将为这十个项目预计的25万桶油当量/日的峰值净产量做出重大贡献。

Mento 平台是在特立尼达拉布雷亚的 TOFCO 制造厂建造的。

bpTT总裁David Campbell表示:“我非常荣幸地宣布,我们与合作伙伴EOG Resources Trinidad Ltd.已从Mento项目投产,并已开始生产首批天然气。对于bpTT而言,这是我们今年的第二项投产项目,也切实证明了与其他公司合作将急需的天然气投入生产所带来的益处。bpTT与EOG的合作进展顺利,我们将继续推进下一个合资项目——Coconut。”

 

 

阅读最新一期的《油田技术》杂志,了解上游新闻、项目故事、行业见解和技术文章。

《油田技术》2025年3/4月刊

《油田技术》2025 年 3/4 月刊包含有关井场监测、钻井性能、自主油田、FPSO、海底生产挑战和井泵操作的文章。

在线阅读文章:https://www.oilfieldtechnology.com/drilling-and-production/03062025/bptt-announces-first-gas-from-mento-development-offshore-trinidad-and-tobago/

 

这篇文章被标记为:

勘探新闻 上游钻井新闻


原文链接/OilFieldTechnology

bpTT announces first gas from Mento development offshore Trinidad and Tobago

Published by , Editorial Assistant
Oilfield Technology,


bp Trinidad and Tobago (bpTT) has announced that the Mento development has safely delivered first gas through connection of the initial discovery well and the drilling campaign for the remaining seven gross wells on the platform will now begin.

bpTT announces first gas from Mento development offshore Trinidad and Tobago

Mento is a 50/50 joint venture between EOG Resources Trinidad Ltd (EOG) and bpTT, with EOG as the operator. The development features a 12-slot, attended facility that is located in acreage jointly licensed by bpTT and EOG off Trinidad’s southeast coast.

Mento is one of bp’s 10 major projects expected to start up worldwide between 2025 and 2027 that bp announced earlier this year as part of its strategy to grow the upstream. Production from Mento will make a significant contribution towards the 250 000 boe/d combined peak net production expected from these 10 projects.

The Mento platform was built at the TOFCO fabrication yard, La Brea, Trinidad.

bpTT president David Campbell said: “I am proud to announce first gas from Mento with our partner EOG Resources Trinidad Ltd. For bpTT, this represents our second start up this year and it is tangible proof of the benefits of partnering with others to bring much needed gas into production. The bpTT/EOG partnership is progressing well as we continue to work on our next joint venture project Coconut.”

 

 

Read the latest issue of Oilfield Technology magazine for upstream news, project stories, industry insight and technical articles.

Oilfield Technology’s March/April 2025 issue

The March/April 2025 issue of Oilfield Technology includes articles on wellsite monitoring, drilling performance, autonomous oilfields, FPSOs, subsea production challenges, and well pump operations.

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/03062025/bptt-announces-first-gas-from-mento-development-offshore-trinidad-and-tobago/

 

This article has been tagged under the following:

Exploration news Upstream drilling news