Zion Oil & Gas 宣布,其米吉多-耶斯列 1 号(MJ-01)井重返大气层后的初始回流作业已使天然气到达以色列陆上地面。
射孔和增产作业已成功完成,在早期返排期间地面观察到气体。该井目前处于增产液回收和清洁阶段。Zion 正在采购更多设备,以继续进行返排测试并进行体积分析以评估储层特性。这些工作是 Zion 正在进行的评估该井生产潜力计划的一部分。
Zion Oil & Gas 宣布,其米吉多-耶斯列 1 号(MJ-01)井重返大气层后的初始回流作业已使天然气到达以色列陆上地面。
射孔和增产作业已成功完成,在早期返排期间地面观察到气体。该井目前处于增产液回收和清洁阶段。Zion 正在采购更多设备,以继续进行返排测试并进行体积分析以评估储层特性。这些工作是 Zion 正在进行的评估该井生产潜力计划的一部分。
Zion Oil & Gas announced that initial flowback operations from its Megiddo-Jezreel #1 (MJ-01) well re-entry have resulted in gas reaching the surface onshore in Israel.
Perforation and stimulation operations were successfully completed, with gas observed at surface during early flowback. The well is currently in the stimulation fluid recovery and cleaning phase. Zion is sourcing additional equipment for that to continue flowback testing and conduct volumetric analysis to evaluate reservoir characteristics. These efforts are part of Zion’s ongoing plan to assess the well’s production potential.