OTC 2025:新方法降低关键海上应用中的ESP风险

2025年4月29日
贝克休斯为巴西海上一家寻求提高稠油油田产量的运营商提供人工举升援助。

作者:泰勒·希尔克(Tyler Shirk),贝克休斯

 

在深水井和高投资井等高风险应用中,ESP过早故障和产量损失是运营商无法承受的成本。在干预成本高昂且交付周期长的关键应用中尤其如此。在这些情况下,可靠性和正常运行时间至关重要。

原文链接/Offshore_Mag

OTC 2025: New approach mitigates ESP risks in critical offshore applications

April 29, 2025
Baker Hughes provided artificial lift assistance to an operator offshore Brazil seeking to improve its output on a heavy oil field.

By Tyler Shirk, Baker Hughes

 

In risky applications like deepwater and high-investment wells, premature ESP failures and lost production are costs that operators cannot afford. This is especially true in critical applications where intervention costs are high and lead times are long. In these situations, reliability and uptime are nonnegotiable.