Trio Petroleum 证实加州油井有“主要”油气聚集

世界石油工作人员 2023 年 5 月 16 日

(WO) — Trio Petroleum Corp. 宣布,其 HV-1 井已确认位于加利福尼亚州蒙特雷县的 South Salinas 项目的 Presidents 油田出现大量油气聚集。

Trio Petroleum HV-1 井的石油和天然气钻机
由 Trio 石油公司提供

HV-1 井距 Trio 的 HV-3A 发现井两英里,该井在 3,750 至 5,100 英尺的深度发现了优质中重力石油。HV-1 井钻探深度约 1,800 英尺在达到总深度 6,631 英尺之前,蒙特雷地层的主要迹象显示有石油和天然气。该公司目前正在从地面到总深度下套管,以正确完成该井,并开始评估收集到的井数据。

HV-1 井是在一个新的石油和天然气田上钻探的,该公司将其称为总统油田。Presidents油田是一个大型油气开发项目,位于该公司位于加利福尼亚州蒙特雷县的南萨利纳斯项目。HV-1 井位是根据三维地震数据的解释选择的,目的是确认和定义这个新油气田的规模,Trio 拥有该油气田 85.75% 的工作权益。

Trio 首席执行官 Frank Ingriselli 先生评论道:“我们计划在完成完井作业并对从该井获取的新数据进行评估后将 HV-1 井投入生产,之后我们将更好地了解生产率,我们计划在可用时宣布。”

原文链接/worldoil

Trio Petroleum confirms “major” oil, gas accumulation in California well

World Oil Staff May 16, 2023

(WO) – Trio Petroleum Corp. announced that its HV-1 well has confirmed a major accumulation of oil and gas in the Presidents field in its South Salinas project located in Monterey County, California.

oil and gas drilling rig at Trio Petroleum's HV-1 well
Courtesy of Trio Petroleum Corp.

The HV-1 well is a two-mile step-out from Trio’s HV-3A discovery well that found high-quality, mid-gravity oil at depths between 3,750 to 5,100 ft. The HV-1 well drilled through approximately 1,800 ft of the Monterey Formation with major indications of oil and gas prior to reaching total depth at 6,631 ft. The company is currently running well casing from surface to total depth to properly complete the well and is commencing its evaluation of the well data collected.

The HV-1 well was drilled on a new oil and natural gas field that the company refers to as the Presidents field. The Presidents field is a large oil and gas development project located in the company’s South Salinas project in Monterey County, California. The HV-1 well location was chosen based on interpretation of three-dimensional seismic data with the goal of confirming and defining the magnitude of this new oil and gas field, in which Trio owns an 85.75% working interest.

Mr. Frank Ingriselli, Trio’s Chief Executive Officer, commented “We plan to put the HV-1 well on production after we finalize completion operations and our evaluation of the new data we are acquiring from the well, after which we will have a better understanding of production rates, which we plan to announce when available.”