新闻离岸前沿

Eni 在 Bacton CCS 项目上钻探第一口评估井

埃尼公司运营的一口评估井在北海南部的休伊特油田钻探,用于巴克顿碳封存项目。这是在北海过渡管理局(NSTA)许可的区块上钻探的首个碳封存评估井,也是2023年全球首轮大规模碳封存许可发放的一部分。

休伊特气田位于诺福克海岸18英里处,是英国大陆架服役时间最长的气田之一。其最初的运营商菲利普斯公司于1969年开始生产该气田,这使得休伊特气田成为继西索尔气田和莱曼气田之后,第三个达到这一阶段的北海气田。到2023年永久关闭时,该气田已生产了3.5万亿立方英尺天然气。

如今,埃尼集团希望将休伊特碳库重新用作碳储存设施,为其巴克顿碳捕集与封存项目提供支持。据信,该项目每年可封存巴克顿及更广泛的泰晤士河口地区排放的高达1000万吨二氧化碳,并有可能为整个欧盟的排放者提供脱碳解决方案。

埃尼公司与 Valaris 72 自升式钻井平台签订了钻井合同,钻井工作于 2025 年 5 月开始。钻井过程中进行了广泛的数据采样,包括切割 270 英尺岩心并进行氮气注入测试,然后将其封堵并丢弃。

所收集的数据将为 Bacton CCS 项目的开发计划提供信息,使操作员能够更全面地了解油藏的后期生产特征和条件,包括油藏压力、可能的注入率、井筒完整性和泄漏风险。

原文链接/DrillingContractor
NewsThe Offshore Frontier

Eni drills first appraisal well on Bacton CCS project

An appraisal well operated by Eni was drilled on the Hewett field, in the Southern North Sea, for the Bacton CCS project. It is the first carbon storage appraisal well to be drilled on acreage licensed by the North Sea Transition Authority (NSTA) as part of the world’s first large-scale carbon storage licensing round in 2023.

Hewett, 18 mi off the Norfolk coast, was one of the UKCS’s longest serving gas fields. Its original operator, Phillips, started production from the field in 1969, making Hewett only the third North Sea field to reach this stage, after West Sole and Leman. The field had produced 3.5 trillion cu ft of gas by the time it permanently shut down in 2023.

Now Eni wants to give Hewett a new lease of life as a carbon store, underpinning its Bacton CCS project. It is thought to be capable of storing up to 10 million tons of CO₂ per year emitted from the Bacton and wider Thames Estuary area, as well as potentially offering decarbonization solutions for emitters across the European Union.

Eni contracted the Valaris 72 jackup to drill the well, and work got under way in May 2025. Extensive data sampling was conducted, including cutting 270 ft of core and performing a nitrogen injection test, before plugging and abandoning it.

The data collected will inform the development plans for the Bacton CCS project by enabling the operator to build a fuller picture of the reservoir’s post-production characteristics and conditions, including reservoir pressures, possible injection rates, wellbore integrity and leakage risk.