Aker BP“Skarv”油井完整性

来源:www.gulfoilandgas.com 2024 年 3 月 5 日,地点:欧洲

挪威海洋工业局 (Havtil) 对 Aker BP 及其 Skarv 油井完整性进行了审计。此次审计于 2023 年 10 月 31 日至 11 月 2 日期间进行。

背景
油井完整性缺乏可能是石油行业发生重大事故风险的一个原因。Havtil 致力于帮助降低此类事件的风险,并确保石油行业系统地开展工作,以降低井控事件和碳氢化合物泄漏的风险。

目的
审计的目的是验证 Aker BP 是否遵守有关 Skarv 油井完整性的法规及其自身要求。在审计过程中,我们希望核实该公司是否建立了监测Skarv油田作业井完整性的管理体系,流程和程序是否符合监管要求,以及是否有足够的人员和专业知识参与监测。井屏障元件的验证和风险评估。井屏障元件性能的设计、验证和记录是审计的关键方面。

结果
审核期间未发现任何不合格项,但我们观察到一个因素,我们选择将其归类为改进点。这涉及到:

井壁设计不充分

现在会发生什么?
我们已要求 Aker BP 向我们提供他们对截至 2024 年 3 月 22 日观察到的改进点的评估。

挪威钻井工程和设备系统新闻 >>






原文链接/gulfoilandgas

Aker BP – Skarv – well integrity

Source: www.gulfoilandgas.com 3/5/2024, Location: Europe

The Norwegian Ocean Industry Authority (Havtil) has carried out an audit of Aker BP and their follow-up of well integrity at Skarv. The audit was conducted from 31 October to 2 November 2023.

Background
A lack of well integrity can be a contributor to major accident risk in the petroleum industry. Havtil is committed to helping reduce the risk of such incidents and ensuring that the petroleum industry works systematically to reduce the risk of well control incidents and hydrocarbon leaks.

Objective
The objective of the audit was to verify that Aker BP is complying with the regulations and its own requirements relating to well integrity at Skarv. During the audit, we wanted to verify that the company has established management system(s) for monitoring the well integrity of wells in operation on the Skarv field, whether processes and procedures meet regulatory requirements, and whether sufficient staffing and expertise are involved in monitoring, verification and risk assessment of well barrier elements. The design, verification and documentation of the performance of well barrier elements were key aspects of the audit.

Result
No non-conformities were identified during the audit, but we observed one factor that we have chosen to categorise as an improvement point. This concerned:

Inadequate well barrier design

What happens now?
We have asked Aker BP to provide us with their assessment of the improvement point observed by 22 March 2024.

Drilling Engineering & Equipment Systems News in Norway >>