Odin-3评估井

来源:www.gulfoilandgas.com 5/17/2024,地点:未分类

Vintage Energy Ltd,50% 的权益持有者和 PRL 211 合资企业的运营商(其他权益持有者:Metgasco Ltd,25%;和 Bridgeport (Cooper Basin) Pty Ltd,25%)提供了有关拟议 Odin 的以下最新信息: 3 评估在 2024 年 3 月 27 日的投资者介绍中已明确预示,该评估需要获得合资企业的批准。

合资企业已经考虑了在 Odin-2 之后立即进行 Odin-3 演习的提议,并进行了正式投票。 Odin-3 包含在合资企业批准的 24 财年预算中,但 Vintage 的合资方此时拒绝支持钻探 Odin-3,而是更愿意在进一步钻探该油田之前评估 Odin-2 的结果和生产绩效。

因此,预计合资企业不会在 Odin-2 后立即钻探该井,而是将推迟,等待合资企业在未来某个时刻重新考虑。

不过,Vintage 将继续尽早钻探 Odin-3。 Vintage 还将推荐并调查 Vali 和 Odin 油田的进一步项目和活动,以通过现有的销售合同增加澳大利亚东部市场的天然气供应。

董事总经理 Neil Gibbins 表示,“din-3 旨在评估该气田的西侧,获取前两口井未处理的天然气,并从该气田提供额外的气流。 Vintage 认为,该井的优点是显而易见的,特别是与 Odin-2 连续钻探(2024 年 5 月 15 日开钻)时,我们认为钻探的延迟是不幸的。”

此版本已获得代表授权Vintage Energy Ltd 的董事总经理 Neil Gibbins 先生。

澳大利亚钻井新闻>>



英国 >> 5/21/2024  - Odfjell Technology (UK) Limited 很高兴地宣布 Equinor (UK) Limited 已就提供...的合同行使了 2 年期选择权。
澳大利亚 >> 2024 年 5 月 17 日 - Vintage Energy Ltd,50% 权益持有人和 PRL 211 合资企业运营商(其他权益持有人:Metgasco Ltd,25%;以及 Bridgeport (Cooper ...

哥伦比亚 >> 5/16/2024  - Arrow Exploration Corp.(“Arrow”或“公司”)是一家高增长运营商,在哥伦比亚主要碳氢化合物盆地拥有资产组合,计划...
澳大利亚 >> 2024 年 5 月 15 日 - Vintage Energy Ltd,50% 权益持有人和 ATP 2021 合资企业运营商(其他权益持有人:Metgasco Ltd,25%;以及 Bridgeport (Cooper...




原文链接/GulfOilandGas

Odin-3 appraisal well

Source: www.gulfoilandgas.com 5/17/2024, Location: Not categorized

Vintage Energy Ltd, 50% interest-holder and Operator of the PRL 211 Joint Venture (other interest-holders: Metgasco Ltd, 25%; and Bridgeport (Cooper Basin) Pty Ltd, 25%) provides the following update on the proposed Odin-3 appraisal well foreshadowed in the Investor Presentation of 27 March 2024 as being subject to joint venture approval.

The proposal to drill Odin-3 in the current campaign, immediately after Odin-2, has been considered by the joint venture and a formal vote conducted. Odin-3 is included in the joint venture approved FY24 budget, however Vintage’s joint venture parties declined to support drilling Odin-3 at this time, preferring to assess the results and production performance from Odin-2 prior to further drilling on the field.

Consequently, the drilling of the well by the joint venture immediately after Odin-2 is not anticipated, being deferred pending reconsideration by the joint venture at a future juncture.

Vintage, however, will continue to pursue drilling Odin-3 at the earliest opportunity. Vintage will also recommend and investigate further projects and activities at both the Vali and Odin fields to increase gas supply into the Eastern Australian market via the sales contracts in place.

Neil Gibbins, Managing Director said “Odin-3 is designed to appraise the western flank of the field, access gas not addressed by the preceding two wells and to provide additional gas flow from this field. In Vintage’s view, the merits of the well are clear, especially when drilled back-to-back with Odin-2 (spudded 15 May 2024) and we consider the delay in drilling unfortunate.”

This release has been authorised on behalf of Vintage Energy Ltd by Mr. Neil Gibbins, Managing Director.

Drilling News in Australia >>



United Kingdom >>  5/21/2024 - Odfjell Technology (UK) Limited are delighted to announce that Equinor (UK) Limited have exercised a 2-year option on the contract for the provision o...
Australia >>  5/17/2024 - Vintage Energy Ltd, 50% interest-holder and Operator of the PRL 211 Joint Venture (other interest-holders: Metgasco Ltd, 25%; and Bridgeport (Cooper ...

Colombia >>  5/16/2024 - Arrow Exploration Corp. ("Arrow" or the "Company"), the high-growth operator with a portfolio of assets across key Colombian hydrocarbon basins, is pl...
Australia >>  5/15/2024 - Vintage Energy Ltd, 50% interest-holder and Operator of the ATP 2021 Joint Venture (other interest-holders: Metgasco Ltd, 25%; and Bridgeport (Cooper...