Tower Resources 与 Borr Drilling Limited 签订合同

作者:
, 《油田技术》副主编


Tower Resources plc 宣布,已与 Borr Drilling Limited 签署了一份合同,租用 Norve 自升式钻井平台(Borr 的高规格钻井平台之一),在 Tower 的钻井平台上钻 NJOM-3 井。 2024 年在喀麦隆获得塔利牌照。

该公司还宣布打算通过认购约 3 000 000 000 股每股面值 0.001 便士的普通股,以每股认购股份 0.02 便士的价格(认购价)筹集约 60 万英镑的总收益,折价约为价格为 2023 年 12 月 15 日股票收盘价的 13%。 作为认购的一部分,董事长兼首席执行官杰里米·阿舍 (Jeremy Asher) 将认购 80,000 英镑的新普通股。

钻机合同

该钻井平台目前须遵守现有合同,交付一系列油井,其时间自然会受到运营不确定性的影响。这些井完工后,该钻机预计将于 2024 年 4 月至 8 月期间在喀麦隆投入使用。因此,根据该钻机在此期间可用的情况,该公司预计 NJOM-3 井将在第二季度或可能开钻2024 年第三季度。随着临近,该钻机可用的预计日期范围将缩小。

该合同还取决于有关该公司塔利许可证延期的最终文件以及预付部分预期钻机租金的先决条件。合同的其他条款是保密的,但该公司可以确认该钻机的合同日费率符合该公司最新的成本预测。

在线阅读文章:https://www.oilfieldtechnology.com/drilling-and-product/18122023/tower-resources-executes-contract-with-borr-drilling-limited/

 

本文已被标记为以下内容:

石油和天然气新闻


原文链接/oilfieldtechnology

Tower Resources executes contract with Borr Drilling Limited

Published by , Deputy Editor
Oilfield Technology,


Tower Resources plc has announced that it has executed a contract with Borr Drilling Limited for the hire of the Norve jack-up rig, one of Borr’s fleet of high-specification drilling units, to drill the NJOM-3 well on Tower’s Thali license in Cameroon in 2024.

The company is also announcing its intention to raise gross proceeds of approximately £600 000 through subscriptions for approximately 3 000 000 000 ordinary shares of 0.001p each at a price of 0.02p per subscription share (the subscription price), representing a discount of approximately 13% to the closing bid price of the shares on 15 December 2023. It is intended that Jeremy Asher, Chairman & CEO, will subscribe for £80 000 of new ordinary shares as part of the subscription.

The rig contract

The rig is currently subject to existing contracts to deliver a series of wells, whose timing are naturally subject to operational uncertainty. Following the completion of those wells, the rig is expected to be available in Cameroon between April and August 2024. Subject to the rig being available during this time period, the company therefore anticipates that the NJOM-3 well will be spudded in Q2 or possibly Q3 of 2024. The expected date range for the rig’s availability will be narrowed as it draws nearer.

The contract is also subject to conditions precedent concerning the final documentation of the company’s Thali license extension, and prepayment of a portion of the expected rig hire. Other terms of the contract are confidential, but the company can confirm that the contracted day rate for the rig is in line with the company’s latest cost projections.

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/18122023/tower-resources-executes-contract-with-borr-drilling-limited/

 

This article has been tagged under the following:

Oil & gas news