C-NLOPB 在希伯伦事件中发出违规通知

埃克森美孚、KCA Deutag 将于 5 月份对险些发生的弹丸和坠落物体进行审计。

哈特能源员工

加拿大纽芬兰和拉布拉多海上石油委员会 (C-NLOPB) 于 6 月 30 日宣布,已针对希伯伦平台险些发生的事故发出了两份违规通知。

5 月 28 日,希伯伦平台上使用液压拔销器对折臂起重机进行维护时,液压拔销器在承受超出额定能力的负载后发生故障,导致差点射出弹丸并掉落物体。没有人受伤。 

C-NLOPB 向 KCA Deutag 发出的不合规通知称: 

  • 该公司的拉销程序没有足够的信息来说明如何安全地进行工作, 
  • 原始设备制造商的工作程序并未向员工提供,
  • 工作安全分析没有提到超过屈服负荷是一个需要考虑的危险,
  • 30吨和60吨液压千斤顶承受的负载超过其额定能力,
  • 拉杆承受超过屈服强度的负载三倍。

C-NLOPB向埃克森美孚发出的不合规通知称,运营商“未能采取一切合理措施确保所有员工的健康和安全”,未能确保运营的相关信息是正确的。已向工人传达,并且未能确保现场可以随时获取所有操作手册以及其他程序和文件的副本。

C-NLOPB 指示两家公司在 9 月 30 日之前进行审核,以确定导致违规的原因并确保人员得到适当的培训。埃克森美孚还将向当地海上工业发布事故公告。

原文链接/hartenergy

C-NLOPB Issues Non-Compliance Notices in Hebron Incident

Exxon Mobil, KCA Deutag to conduct audit following near-miss projectile and dropped object in May.

Hart Energy Staff

Canada-Newfoundland and Labrador Offshore Petroleum Board (C-NLOPB) announced on June 30 it had issued a pair of notices of non-compliance regarding a near-miss on the Hebron Platform.

On May 28, maintenance on a knuckle boom crane on the Hebron Platform using a hydraulic pin puller resulted in a near-miss projectile and dropped object when the hydraulic pin puller failed after being exposed to loads beyond rated capacities. No one was injured. 

C-NLOPB’s notice of non-compliance to KCA Deutag said: 

  • The company’s procedure for pulling the pin did not have enough information about how to do the work safely, 
  • The original equipment manufacturer’s procedure for the work was not made available to employees,
  • A job safety analysis failed to reference that exceeding yield load was a hazard to consider,
  • The 30-ton and 60-ton hydraulic jacks were exposed to loads beyond their rated capacities and
  • The puller rod was exposed to loads in excess of yield three times.

C-NLOPB’s notice of non-compliance to Exxon Mobil said the operator had “failed to take all reasonable measures to ensure the health and safety” of all employees, that it had failed to ensure the relevant information for the operation was communicated to workers, and that it had failed to ensure a copy of all operating manuals and other procedures and documents were readily accessible on-site.

C-NLOPB instructed both companies to conduct an audit by Sept. 30 to determine what contributed to the non-compliance and ensure people are trained appropriately. Exxon Mobil is also to issue an incident bulletin to the local offshore industry.