Brookside Energy Limited ((Brookside or the Company) is
pleased to provide shareholders and investors with an update on operations from the multi-well Flames-Maroons
Development Plan (FMDP) in the core of the southern SCOOP Play in the Anadarko Basin (Figure 1).
Brookside is pleased to announce that drilling of the Maroons Well has been completed with the well reaching a total
measured depth of ~12,665 feet. Drilling operations were conducted safely, on budget and on schedule. Casing is now being
run in the lateral section of the well and is being cemented in place. Once the final casing string has been cemented in place
the rig will be walked back to the Fleury Well to commence drilling of the intermediate section having previously drilled the
surface hole.
The Maroons is the first horizontal well targeting the Sycamore within this specific drilling unit and will exploit a substantial
reservoir already proven by offset vertical production. The Maroons lateral was successful in its objective to drill in a thick,
productive Sycamore section within a structurally complex area. The brittle nature of the Sycamore in association with this
structural complexity led to the Maroons encountering numerous fractures throughout the length of the lateral. Such
fractures often function as pathways for oil and gas migration and production and help increase the Sycamore’s storage
capacity. Further, drill cuttings along with continuous gas shows help illustrate the Maroons lateral placement in oil and
gas prone reservoir rock.
About the Wells
The FMDP is a multi-well drilling program targeting the highly productive Sycamore and Woodford formations in the SCOOP
area of the southern Anadarko Basin (Figure 2). Of the four wells in the multi-well drilling program, three are being drilled
from the Sanford Pad; the Fleury, Maroons, and Iginla Wells. Once these well have been drilled and cased the drill rig will
move to the Flames Well pad and drill the fourth well, the Rocket Well.
Figure 2: 3D image highlighting the “wine rack” style FMDP drilling program.
Authority:
This announcement has been authorised for release by the Board of Directors of Brookside Energy Limited