TWMA在阿联酋开启钻屑处理新时代


由《油田技术》助理编辑出版


随着 TWMA 在阿布扎比哈布山新建的处理设施开始运营,阿联酋钻屑处理进入了一个新时代。

TWMA在阿联酋开启钻屑处理新时代

TWMA 是钻井废物管理领域的全球领导者,自豪地宣布其位于阿布扎比哈布山的新建处理厂已收到第一批钻屑。

该设施于2025年第一季度末破土动工,是目前世界上最先进、最可持续的钻井废弃物处理设施。它旨在为阿联酋一家大型运营商的100多台钻机提供支持,日处理能力高达300吨钻屑。

该工厂配备了两台TWMA世界领先的RX系列RotoMill®设备,将先进的物料处理技术与智能实时跟踪和分析功能相结合,并通过我们的Xlink®平台实现。工厂和处理系统采用可持续能源,旨在最大限度地减少对环境的影响。同时,该工厂的设计也使其能够随着该地区运营活动和产量的增长,无缝扩展至三台RotoMill®设备。

同样重要的是,该场所旨在成为一个安全、包容和高质量的工作场所,支持 TWMA 的员工安全、高效、自豪地完成他们的工作。

TWMA 首席执行官 Halle Aslaksen 评论道:“该设施展现了我们工程团队的实力、我们员工的能力以及为该地区提供世界一流钻井废物管理服务所需的基础设施规模。”

位于哈布山的这家工厂,内部命名为“羚羊工厂”,展现了先进工程技术与持续改进文化相结合所能取得的成就。我们对未来充满信心,并将继续在中东地区重新定义行业标准。

在线阅读文章:https://www.oilfieldtechnology.com/drilling-and-production/18122025/twma-introduces-a-new-era-of-drill-cuttings-treatment-in-the-united-arab-emirates/

 

本文已添加以下标签:

上游钻井新闻 石油天然气新闻


原文链接/OilFieldTechnology

TWMA introduces a new era of Drill Cuttings Treatment in the United Arab Emirates

Published by , Assistant Editor
Oilfield Technology,


Introducing a new era of Drill Cuttings Treatment in the United Arab Emirates as TWMA begins operations at its newly constructed treatment facility in Habshan, Abu Dhabi.

TWMA introduces a new era of Drill Cuttings Treatment in the United Arab Emirates

TWMA, a global leader in drilling waste management, is proud to announce the first receipt of drill cuttings at its newly constructed treatment facility in Habshan, Abu Dhabi.

Breaking ground in late 1Q25, the facility is the world’s most advanced and self-sustaining drilling waste management site of its kind. Designed to support more than 100 rigs for a major UAE operator, it has the capacity to process up to 300 tpd of drill cuttings.

Powered by two of TWMA’s world-leading RX Series RotoMill™ units, the facility combines state of the art material handling with intelligent, real-time tracking and analytics via our Xlink™ platform. Sustainably powered plant and treatment systems are engineered to minimize environmental impact, while the facility’s design enables seamless expansion to three RotoMill units as operational activity and volumes grow in the region.

Equally important, the site is designed to be a safe, inclusive, and high-quality workplace that supports TWMA’s people in doing their work safely, effectively, and with pride.

Halle Aslaksen, Chief Executive Officer at TWMA, commented: “This facility showcases the strength of our engineering teams, the capability of our people, and the scale of infrastructure required to deliver world-class drilling waste management services to the region.

The facility in Habshan, internally named “The Oryx”, demonstrates what is possible when advanced engineering and a culture of continuous improvement come together. We are very excited for the future as we continue to redefine industry standards in the Middle East.”

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/18122025/twma-introduces-a-new-era-of-drill-cuttings-treatment-in-the-united-arab-emirates/

 

This article has been tagged under the following:

Upstream drilling news Oil & gas news