Santos 宣布巴布亚新几内亚 Muruk-1 勘探井取得积极成果

2017 年 5 月 15 日

昆士兰州——桑托斯宣布在巴布亚新几内亚高地钻探的 Muruk-1 勘探井取得了进一步的积极成果。

继 2016 年 12 月宣布在 Muruk-1 成功发现天然气之后,又一条侧线 (Muruk 1ST3) 已成功钻探穿过 Muruk-1 天然气发现西南部的 Toro 储层目标。

测井和压力数据已证实整个托罗储层段处于气体饱和状态。Muruk 1ST3 的 Toro 砂岩层段与原始 Muruk-1 井筒中渗透的优质优质储层相似。

固结 7 英寸后。Muruk 1ST3 在 3,921 m 处钻入尾管,穿透 3,968 m 处的 Toro 顶部,钻探深度为 4,025 m。切割了两个岩心,然后将井加深至 4,130 m,以获取全套测井和压力数据。没有碳氢化合物接触被渗透。

目前正在评估从测井、岩心和压力样本中获取的数据。经合资公司批准后,将进行生产测试,以评估 Toro 的交付能力和潜在流量。最终评估和测试计划完成后,该井将按计划封堵并废弃。

Muruk 钻探计划证实在 Hides 生产设施西北 21 公里处发现了一个潜在重要的新气田。来自 Muruk 钻探计划的数据将被评估,以协助确定前瞻性评估方案。

Santos 自 1980 年代末以来一直在巴布亚新几内亚开展业务。巴布亚新几内亚是桑托斯的五个核心资产之一,公司致力于与国内的长期合作伙伴共同探索和开发。

Muruk 参与者包括桑托斯 (Santos) 的附属公司 (20%)、埃克森美孚 (42.5%) 和 Oil Search (37.5%,运营商) 的附属公司。桑托斯的农场须经过惯例监管部门的批准。

原文链接/worldoil

Santos announces positive results from Muruk-1 exploration well in Papua New Guinea

May 15, 2017

QUEENSLAND -- Santos has announced further positive results from the Muruk-1 exploration well, being drilled in the Papua New Guinea Highlands.

Following the successful gas discovery at Muruk-1, announced in December 2016, an additional sidetrack (Muruk 1ST3) has been successfully drilled through the Toro reservoir objective to the southwest of the Muruk-1 gas discovery.

Well logs and pressure data have confirmed that the entire Toro reservoir section is gas saturated. The Toro Sandstone interval in Muruk 1ST3 is similar to the excellent, high quality reservoir penetrated in the original Muruk-1 wellbore.

After cementing the 7-in. liner at 3,921 m, Muruk 1ST3 penetrated the top Toro at 3,968 m and was drilled to a depth of 4,025 m. Two cores were cut and the well was then deepened to 4,130 m, to enable a full suite of logs and pressure data to be acquired. No hydrocarbon contact was penetrated.

The data acquired from logging, cores and pressure samples is now being evaluated. Subject to Joint Venture approval, a production test will be undertaken, to assess the deliverability and potential flow rates from the Toro. After completion of the final evaluation and testing program, the well will be plugged and abandoned, as planned.

The Muruk drilling program confirms the discovery of a potentially significant new gas field, 21 km northwest of the Hides production facilities. The data from the Muruk drilling program will be evaluated to assist in the definition of forward appraisal options.

Santos has operated in PNG since the late 1980’s. PNG is one of Santos’ five core assets and the company is committed to working with its long-term partners in-country to explore and develop.

Muruk participants are affiliates of Santos (20%), affiliates of Exxon Mobil (42.5%) and Oil Search (37.5%, operator). Santos’ farm-in is subject to customary regulatory approvals.